loading

New acute-care Hospital

THE PROJECT

Studio Introzzi took care of the working design and statical calculation of the roof metal cladding systems for the new hospital of Monselice – Este (U.L.S.S. 17).

The new hospital is made up of three main buildings, with a covering system intended to reproduce the evolution of the nearby Euganean Hills which gradually slopes towards the surronding green areas.


 

THE INTERVENTION

The roof cladding was carried out in part with a double skin non-ventilated built-up roof system incorporating standing seam profiled aluminium alloy weathering sheets (Kalzip 50/429) on a trapezoidal sheets steel deck, in part with a single skin roof system (also with Kalzip 50/429 stansing seam sheets) with titan-zinc panels installed as false-ceiling.
Works’ size: 60,500 sq.m. (roof cladding 44,000 sq.m., false ceiling 46,500 sq.m.).

New acute-care Hospital

Category

Public Buildings

Date

febbraio 18, 2013

Client

Hospital Monselice - Este

Client

Franzen Italia

Designer

NET Engineering

Share this Project

Ospedale Unico

Monselice-Este-PD
Italy
2012-2013

Prada footwear centre

previous project in: Industrial and Logistics
completed: 26 November 2012

Read More

Amendola Air Base

next project in: Public Buildings
completed: 02 April 2014

Read More