loading

Prada footwear centre

THE PROJECT

Studio Introzzi took care of the working design and statical calculation of the wall metal cladding systems for the new Prada’s centre for research, design and production of footwear.


 

THE INTERVENTION

The cladding of the sawtooth roofs was carried out with waterproofing membrane, with rigid mineral wool insulation and ThyssenKrupp’s T.50 trapezoidal sheets steel deck.
The cladding of the box girders and of the lift towers was carried out with ThyssenKrupp Isowand Integral 60 sandwich panels fixed on a load-bearing framework.
Total works’ size: 13.000 sq.m. (roof cladding 8.000 sq.m., wall cladding 5.000 sq.m.).
Studio Introzzi performed activities of job-site management and drafted the Safety plan for the erection firm.

Prada footwear centre

Category

Industrial and Logistics

Date

novembre 26, 2012

Client

Prada footwear centre

Client

Hoesch Contecna Systembau GmbH

Designer

Favero & Milan

Share this Project

PRADA

Valvigna, PR
Italy
2003 - 2012

Akros Bank

previous project in: Interior and Civil Engineering
completed: 13 September 2012

Read More

New acute-care Hospital

next project in: Public Buildings
completed: 18 February 2013

Read More