Waste disposal facility in Palermo
THE PROJECT
Extension works of the waste disposal facility in Bellolampo, which included the construction of the fourth dumping ground and of the new waste transfer station, and the preliminary design (architectural concept by Tange Associates) of a proposed waste-to-energy power plant.
THE INTERVENTION
Studio Introzzi performed activities of coordination for the drafting of the civil engineering documents aimed at obtaining authorisation from the Regional government.
Total works’ size: 130.000 sq.m.
Studio Introzzi also performed activities of coordination of safety measures during the planning phase.
Waste disposal facility in Palermo
Category
Date
dicembre 19, 2009
Client
Amia Bellolampo
Cliente
Palermo Energia Ambiente S.p.A.
Designer
Tange Associates
Share this Project
Amia Bellolampo
Palermo
Italy
2003 - 2009