loading

Waste disposal facility in Palermo

THE PROJECT

Extension works of the waste disposal facility in Bellolampo, which included the construction of the fourth dumping ground and of the new waste transfer station, and the preliminary design (architectural concept by Tange Associates) of a proposed waste-to-energy power plant.


 

THE INTERVENTION

Studio Introzzi performed activities of coordination for the drafting of the civil engineering documents aimed at obtaining authorisation from the Regional government.
Total works’ size: 130.000 sq.m.
Studio Introzzi also performed activities of coordination of safety measures during the planning phase.

Waste disposal facility in Palermo

Category

Power plants

Date

dicembre 19, 2009

Client

Amia Bellolampo

Cliente

Palermo Energia Ambiente S.p.A.

Designer

Tange Associates

Share this Project

Amia Bellolampo

Palermo
Italy
2003 - 2009

Yas Marina Circuit

previous project in: Leisure
completed: 11 May 2009

Read More

IKEA Store – San Giuliano – Italy

next project in: Commercial
completed: 20 January 2010

Read More